Standard Kit Includes:
- SIP panels for walls, floor, and roof
- Ground Screw Foundations
- UPVC Windows and doors
- Thermowood Cladding
- EDPM Roof Kit & Trims
- Composite Decking
- Ground level Electrical Connection within 20 metres of main fuseboard subject to survey.
- Allowance included for a 4 way fusebox, 4 downlights and 3 double sockets in rooms up to 15 sqm. 8 down lights and 6 double sockets in rooms over 16 sqm. All new connections and circuits will be fully tested and a certificate issued.
- Studwork Internal dry lining and plastering.
- Skirting Boards
- Laminate Flooring
- Full assembly of the SIP panel building